Fire Rebuild · Malibu / Pacific Palisades
One firm from burned lot to certificate of occupancy.
Rebuilding after a fire usually means hiring a surveyor, an engineer, a drafter, and a contractor — then managing the hand-offs between them for eighteen months. We hold the Class A and Class B licenses and produce the plans ourselves. One firm, one contract, no hand-offs.
The bottleneck is engineering, not construction
Most rebuild delays happen before ground breaks: surveys, structural plans, and plan check. We produce all of it in-house, so the file moves.
Site data before the first meeting
Through our partnership with Pacific Intelligence, drone survey and topography are captured up front — your project starts with the parcel already documented.
Verifiable, local, accountable
Post-disaster markets attract out-of-area operators. Every claim we make — license, bond, classifications — checks out on the CSLB site in thirty seconds.
Start with a conversation