Bel Air Construction GroupBEL AIRCONSTRUCTION GROUP
CSLB #1044379 · A + B LICENSED · SINCE 2018

Fire Rebuild · Malibu / Pacific Palisades

One firm from burned lot to certificate of occupancy.

Rebuilding after a fire usually means hiring a surveyor, an engineer, a drafter, and a contractor — then managing the hand-offs between them for eighteen months. We hold the Class A and Class B licenses and produce the plans ourselves. One firm, one contract, no hand-offs.

01
Site Survey
Drone capture and topography via Pacific Intelligence
02
Engineering
Structural and civil design — Class A scope
03
Drafting & Permits
Plans drawn by the principals, shepherded through the county
04
Build
Constructed under the same Class B license
05
Occupancy
One accountable firm, survey to CO

The bottleneck is engineering, not construction

Most rebuild delays happen before ground breaks: surveys, structural plans, and plan check. We produce all of it in-house, so the file moves.

Site data before the first meeting

Through our partnership with Pacific Intelligence, drone survey and topography are captured up front — your project starts with the parcel already documented.

Verifiable, local, accountable

Post-disaster markets attract out-of-area operators. Every claim we make — license, bond, classifications — checks out on the CSLB site in thirty seconds.

Start with a conversation

Tell us your parcel. We'll tell you where your rebuild actually stands.